← All packages

Pro Facility

Commercial-scale athletic centers, end to end

Starting at
From $15,000
Scoped per project
Timeline
8–16 weeks
Best for
Gym operators, clubs, and performance centers
Scope
Commercial floors from 2,000 sq ft, single or multi-site

Overview

Full facility design and delivery: capacity modelling, high-load engineering input, member flow, brand environment and hands-on project management through opening day.

What's included

  • +Capacity and revenue-per-sq-ft modelling
  • +Full floor plan set and 3D visuals
  • +High-load platform and rig engineering input
  • +Equipment procurement and negotiation
  • +Brand environment: signage, wayfinding, wall graphics
  • +Weekly project management through opening

Process

  1. 01

    Scoping

    Site review, business model and target member profile.

  2. 02

    Concept

    Zoning, capacity model and concept visuals for sign-off.

  3. 03

    Documentation

    Technical drawings, specs and procurement schedule.

  4. 04

    Build

    Contractor coordination, installs and snagging.

  5. 05

    Launch

    Staff walkthrough, floor SOPs and opening support.

Request a quote

Pro Facility

Example builds

What This
Looks Like

Illustrative scopes showing how the Pro Facility package is typically applied. Representative examples, not named client projects.

3,800 sq ft strength and conditioning gym

Space
Single-unit industrial shell
Budget
$210k build + $15k fee
Timeline
12 weeks

Capacity modelled at 40 members on the floor at once: eight-station rig, six platforms, a 30-metre turf lane and a recovery corner, with member flow routed away from the lifting zone.

  • /Capacity and revenue-per-sq-ft model
  • /Rig and platform load engineering input
  • /Procurement negotiated across three suppliers

Multi-site club rollout

Space
Two floors, 2,400 sq ft each
Budget
$260k build + scoped fee
Timeline
16 weeks

One repeatable floor template applied to two sites so equipment, signage and staff SOPs stay identical, with weekly project management through both opening days.

  • /Repeatable template across sites
  • /Shared signage and wayfinding kit
  • /Staff walkthrough and floor SOPs at launch

Other packages